This article series discusses roofing felt specifically addressing the roofing code or roofing manufacturer s requirements for use of an underlayment such as roofing felt tarpaper or other underlayment products beneath asphalt shingles and other.
Rooftop guard 2 underlayment.
These unique design features when coupled with exceptional tear strength and excellent adhesion allows the contractor to easily carry the roll up and down the ladder.
Is roofing felt required.
Roofing underlayment roofing felt requirements.
The drip edge shall extend back on the roof a minimum of 2 inches 51 mm.
Rooftopguard ii is a 5 ply 100 asphalt and asbestos free high strength performance roofing underlayment used on stoop sloped roofs beneath composite metal clay concrete slate wood and other roofing materials.
Epilay plystik plus is an extremely strong roofing underlayment with a 48 mil thickness and a 2 square roll weighing 48 lbs.
Underlayment shall be installed over drip edges along eaves.
It is available in 2 square 3ftx66 7ft rolls.
With rooftopguard ii rooftopguard ii lays flat covers quickly with the 5 wide rolls and you can actually walk on it not only when it s dry but wet also.
Drip edges shall be installed over underlayment along rake edges.
Felt details for various roof slopes amp.
Its 5 layer polypropylene polyethylene construction results in high strength low weight unmatched tear resistance and long life that simply blows away the competition.
All plastic or steel caps must be attached flush with the underlayment surface and nails must be fastened at a 90 degree angle to the deck.
Rooftopguard ii premium synthetic roofing underlayment is a long term solution that provides an excellent moisture barrier can be used under all types of roofs is a superior alternate to 15 and 30 paper felt.
Drip edges shall be mechanically fastened a maximum of 12 inches 305 mm on center.