As soon as you have a hole you are providing a path for water.
Running wires through a roof.
You can seal it but it s always going to be a weak spot.
In this video we install a roof mounted wiring box with waterproof cable glands.
Please refer to these above options as a guide only.
The best way is to go around the roof not through it.
Running wires through the roof reply 5 on.
The code requirement that the pv source and output conductors be kept outside the building until the readily accessible disconnect is reached indicate that these conductors are to be treated in a manner similar to ac service entrance conductors 690.
I could read the reg s section 2 3 2 from the electricans guide to the reg s to say that if a cable passes through joists it needs to be 50mm from top or bottom or in earther conduit.
The actual install of recessed lights here https youtu be 5yc8aqnvqqg the long bit is actually used.
I am a radio amateur and want to run an antenna cable through my house s tiled roof up by the chimney length of cable run is important and running it down over the tiles over the gutter then up and in through the soffit is too long and there s no way to fix the cable on the 5m run down the tiles.
The next step is to run the solar or antenna cables into the rv through the new access hole.
What does the nec say about running the pv wires through the roof.
Suggested practices it says.
First drill holes in the side of the box for cables big enough to fit the threaded end of the cable gland make sure to leave room for future cables.
Run the cables through the roof access.
Better to come out of wall then go up to the roof.
The installer ran the wires without properly sealing them and without leaving an option to add future wires.
This option is quite self explanatory where a hole is simply drilled through the outer roof skin and wires passed through a rubber grommet into the roof cavity and fed down into the vehicle.
Drilling through the roof.
Thanks all it s a little confoosing.
Additionally if you ever need to redo the roof it will be a pain to deal with the wires that are now in the way.
Looking at the pv power systems and the 2005 nec.